Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 26 results ...

Abdirad, H (2020) Developing digital project delivery routines around frequent disruptions: How do AEC organizations respond to disruptive information exchange requirements?, Unpublished PhD Thesis, , University of Washington.

Al-Saleh, F S (1980) A case study and evaluation of a technological delivery system: Construction management in Saudi Arabia, Unpublished PhD Thesis, , University of Washington.

Astaneh Asl, B (2019) Effects of using virtual reality on AEC team collaboration, Unpublished PhD Thesis, , University of Washington.

Azari Najafabadi, R (2013) An evaluation framework for the integrated design process of sustainable high-performance buildings, Unpublished PhD Thesis, , University of Washington.

Fardhosseini, M S (2021) A quantitative analysis of the impact of integrating digital technology for formwork fabrication on human factors perspectives, Unpublished PhD Thesis, , University of Washington.

Gambatese, J A (1996) Addressing construction worker safety in the project design, Unpublished PhD Thesis, , University of Washington.

Gutub, S (2019) Framework for the implementation process of public-private partnerships (P3s) in highway projects, Unpublished PhD Thesis, , University of Washington.

Ho, C T T (2019) Application of optimization to the production planning of construction prefabrication supply chains, Unpublished PhD Thesis, , University of Washington.

Homayouni, H (2015) Aligning contractual, technological, and organizational elements to achieve higher performance buildings: A qualitative comparative analysis approach, Unpublished PhD Thesis, , University of Washington.

Lee, N H (2009) A framework for developing new visualization schemes for construction project performance monitoring, Unpublished PhD Thesis, , University of Washington.

Lee, W (2018) Use of wearable sensors to unveil roles of task demands-personal resources and burnout on performance of construction workers, Unpublished PhD Thesis, , University of Washington.

Lewis, N S (2023) Development of an open-source methodology for simulation of civil engineering structures subject to multi-hazards, Unpublished PhD Thesis, , University of Washington.

Lowry, M B (2008) An online analytic-deliberative approach to public participation for transportation investment decisions, Unpublished PhD Thesis, , University of Washington.

Manninen, D L (1981) Labor force migration associated with nuclear power plant construction, Unpublished PhD Thesis, , University of Washington.

Mukherjee, A (2005) A multi-agent framework for general purpose situational simulations in construction management, Unpublished PhD Thesis, , University of Washington.

Ottesen, J (2019) CPM schedule density: A new predictor for productivity loss, Unpublished PhD Thesis, , University of Washington.

Pathak, C (2021) Electric vehicle infrastructure decision support system, Unpublished PhD Thesis, , University of Washington.

Pratama, L A (2023) Immersive visualization intervention on pull planning, Unpublished PhD Thesis, , University of Washington.

Shang, L (2019) Achieving public agency goals in public-private partnerships using innovative payment mechanisms, Unpublished PhD Thesis, , University of Washington.

Son, J (2011) An integrated model of evolution of project teams in large-scale construction projects, Unpublished PhD Thesis, , University of Washington.

Stevens, J D (1981) A study of the relationship between perturbations in construction time schedules and potential construction claims, Unpublished PhD Thesis, , University of Washington.

  • Type: Thesis
  • Keywords: construction project; critical path method; decision making; government; Monte Carlo simulation; simulation
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/303175467
  • Abstract:
    The purpose of this research was to investigate, document and analyze the relationship between perturbations in time schedules of a construction project and the potential for future Construction Claims based on the same scheduled work, and to develop an Interactive Program to assist a Decison Maker (DM) in the avoidance, justification, and/or defense of potential Construction Claims. A model was created that resembles the phenomenon under study. This model contains a modified Critical Path Method (CPM) time schedule. Procedures were then developed to perform the following functions on the model: (a) generate and update CPM time schedules; (b) detect and report, to the DM, perturbations in the time schedules in a timely fashion; (c) provide deterministic and statistical data, based solely on recent performance to assist the DM in predicting future schedule adherence; (d) provide data via a brief Claims Data Base to serve as a guide in making decisions related to potential Construction Claims. The Interactive Program was developed, on an APPLE II micro-computer, to implement these functions and to display, for the DM's selection, a menu of entry points to the Claims Data Base. These entry points are from the subject headings of The Government Contractor: 21 Year Index. The Interactive Program makes no decisions regarding potential Construction Claims, but "flags" the DM when schedule perturbations indicate changes in contractual dates. It then provides hints to assist in determining responsibility for the perturbations, deterministic and statistical data to predict future schedule adherence, and suggestions for the avoidance, justification, and/or defense of potential Construction Claims. An actual project was selected and construction progress simulated using Monte Carlo simulation techniques in order to demonstrate the Interactive Program and the decision making process.

Tench, B (2022) Designing restoration: Protecting and restoring our attention through participatory design, Unpublished PhD Thesis, , University of Washington.

Wang, S (2017) Integrated approach and analysis of reliability, robustness, resilience and infrastructure applications, Unpublished PhD Thesis, , University of Washington.

Yamaura, J T (2018) The value of cloud computing technology in public transportation construction, Unpublished PhD Thesis, , University of Washington.

Zhang, Z (2021) Participatory ergonomics in construction: Enabling practice-to-research-to-practice via the 2safemodel, Unpublished PhD Thesis, , University of Washington.

Zokaei Ashtiani, M (2022) Data-driven sustainability assessment in roadway infrastructure construction, Unpublished PhD Thesis, , University of Washington.